Resource Center

Everything you need to create perfect custom promotional products

Artwork Guidelines

File formats, resolution requirements, and color specifications

  • Accepted file types (AI, EPS, PDF, PNG)
  • Resolution: 300 DPI minimum
  • Color modes: CMYK for print, RGB for digital
  • Bleed and safe zones explained

Sizing Charts

Apparel sizing guides for accurate bulk orders

  • Unisex t-shirt sizes
  • Womens sizing conversion
  • Hat and cap measurements
  • Bag dimensions guide

Brand Guidelines

Logo usage and brand consistency standards

  • Logo file formats needed
  • Minimum logo sizes
  • Clear space requirements
  • Color matching (PMS/CMYK/RGB)

Customization Methods

Understanding different imprint techniques

  • Screen printing vs embroidery
  • Laser engraving guide
  • Pad printing applications
  • Full-color digital printing

Order Process Guide

Step-by-step ordering and production timeline

  • How to request a quote
  • Proof approval process
  • Production timelines
  • Shipping and delivery

Artwork Preparation Guide

File Format Requirements

  • Vector Files (Preferred): AI, EPS, PDF - scalable to any size
  • Raster Files: PNG, JPG - minimum 300 DPI at actual size
  • Avoid: Word docs, PowerPoint, low-resolution images

Color Specifications

  • Screen Printing: Provide PMS (Pantone) color codes
  • Full Color: CMYK mode (not RGB)
  • Embroidery: Thread color codes from our chart

Design Tips

  • Keep logos simple - fine details may not reproduce well
  • Minimum text size: 8pt for readability
  • Avoid gradients for screen printing (use spot colors)
  • Provide artwork larger than final print size

Apparel Sizing Guide

SizeChest (in)Length (in)Sleeve (in)
S34-362715.5
M38-4028.516.5
L42-443017.5
XL46-483118.5
2XL50-523219.5

* Sizes may vary slightly by manufacturer. Always order samples before large quantities.

Production Timeline

1

Quote & Design (1-2 days)

Submit quote request, receive pricing and mockups

2

Proof Approval (1-3 days)

Review and approve digital proof

3

Production (10-14 days)

Your products are manufactured

4

Shipping (5-7 days)

Quality check and delivery to you

Total timeline: 3-4 weeks for most products. Rush available!

Need Help?

Our team is here to assist with your project

Contact Us